JD.com Inc's Headquarters in East China are located in Jiading Industrial Zone, Shanghai.
JD's Shanghai Logistics Center (Phase I) in Jiading is the first operational facility constructed as part of its Asia No 1 initiative to strengthen its nationwide infrastructure fulfillment. The deployment began in 2010. The initial phase of the fully automatic warehouse covers about eight hectares with floor space of over 100,000 square meters. The actual used area will reach 230,000 sq m after completion of the project.
As a model of a smart storage and logistics center, the Asia No 1 warehouse is 24 meters high and is divided into three areas to enable multilayer operations. It is fitted with the world's leading fully automated logistics equipment to reduce the heavy reliance on human labor for loading and unloading of goods, transport and sorting.